101 KWp Solar Car Park, Mumbai
2016

Constructing our first solar powered car park initiated at the end of July 2016 and was commenced within a duration of 5 weeks. The end result is an appealing structure that now stands in Nerul. It was erected for an esteemed Educational Institute that wanted a dual use of the free ground space that it had, thereby allowing us to formulate this structure.

Details of the project: